|
Cross River Tram (formerly Cross River Transit) was a Transport for London proposal〔(Transport for London. Cross River Tram )〕 for a tram system in London. It was planned to run on a north-south route from Camden Town in the north, through and , to Peckham and Brixton in the south. The Cross River Tram scheme was proposed to relieve overcrowding on the London Underground and was due to begin operation by 2016. The project was cancelled in 2008 due to funding problems. ==Overview== The tram was planned to relieve overcrowding on the London Underground, and to improve transport in areas currently without good public transport, such as the Aylesbury Estate in Southwark, to support regeneration. Trams would have run up to every 4 minutes on each branch, giving a 2-minute service through central London at peak times. Despite following the same route, it was not envisaged that the Cross River Tram line would use the former Kingsway tramway subway. 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Cross River Tram」の詳細全文を読む スポンサード リンク
|